  1. Quotation and Pricing
    • The quoted price is based on current rebate regulations and the information you have provided. It may be subject to change if government regulations are amended or if actual site conditions differ from those stated.
    • Additional charges may apply if installation requires more materials or services than originally quoted. This may include, but is not limited to, changes of mind, additional copper piping or wiring, switchboard upgrades, or extra labour needed to complete the installation.
    • If you request a change to the installation location on the day of installation, additional charges will apply.
  2. Site Conditions and Compliance
    • All installations involving electrical components require that your property’s electrical wiring and metering systems comply with current Australian Standards. If not, additional rectification costs may be incurred.
    • Astra Green Solutions is not responsible for any delays, rescheduling, or cancellations, including but not limited to site-specific issues, access restrictions, or unforeseen compliance requirements.
  3. Standard Installation Inclusions
    • Standard inclusions are based on the number of indoor units:
      • 3 indoor units: 35 metres of copper piping and 70 metres of wiring
      • 4 indoor units: 45 metres of copper piping and 80 metres of wiring
      • 5 indoor units: 60 metres of copper piping and 100 metres of wiring
    • Standard installation also includes Poly slab and decommissioning of existing heaters.
  4. Decommissioning of Gas Heaters
    • A licensed plumber will perform a gas leakage test when decommissioning ducted gas heaters. If a gas leak is detected, regulations by the Building Authority (BA) and Energy Safe Victoria (ESV) require the gas supply to be shut off until the issue is resolved.
    • Astra Green Solutions’ plumber can offer a quote on-site to rectify the leak, or you may engage your own plumber to complete the work in compliance with regulatory standards.
    • If the installation is cancelled after the gas heater has been decommissioned, Astra Green Solutions will not reinstate the heater. A service fee of $300 + GST will be charged.

 

  1. Paint and Surface Disclaimer
    • Astra Green Solutions is not responsible for paint differences, wall damage, or patching behind any removed or decommissioned air conditioning units.
  2. Product Warranties
    • Product warranty includes 5 years on condensers, indoor head units, and labour. This excludes installation-related parts and components.
  3. Noise Acknowledgement
    • Please note that there will be operational noise from the condenser unit when the split-system air conditioner is running. Refer to manufacturer specifications for exact noise levels.
  4. Gift Card Eligibility
    • Where gift cards or promotional items are offered, full payment must be received before they are shipped.
  5. Payment Terms
    • Full payment is due immediately upon completion of the installation. Failure to make timely payment may result in interest charges, legal action, and/or the disconnection of the installed unit. Astra Green Solutions reserves the right to disconnect or disable the system until payment is received in full.
  1. Stock Responsibility and Ownership

Where Astra Green Solutions (AGS) delivers stock to your property prior to installation, you accept full responsibility for the safekeeping of the goods from the time of delivery until installation is complete. AGS will not be liable for any loss, theft, or damage to the stock once it has been delivered.

In the event that an installation cannot proceed, you must provide AGS with access to retrieve the stock. You agree not to withhold or retain any goods belonging to AGS.

Acknowledgements

By signing this agreement, I acknowledge and understand the following:

  • Astra Green Solutions is the licensed installer and an Accredited Person under the Victorian Energy Upgrades (VEU) Program, and I assign to Astra Green Solutions the right to generate VEECs associated with this installation.
  • Astra Green Solutions is required to decommission my existing ducted gas heater, cap off the gas line, and remove the control valve. The physical removal of the full unit is not included due to practical constraints.
  • My existing heater was not installed with the purpose of qualifying for decommissioning under the VEU program or to obtain rebates unlawfully.
  • I have received, read, and understood the following documents:
    1. VEU Code of Conduct – Statement of Rights
    2. VEU Space Heating and Cooling Consumer Fact Sheet
    3. Victorian Energy Efficiency Target Scheme Consumer Fact Sheet
  • I understand that the placement of the air conditioning units can impact system performance and efficiency. If the units are installed outside the VEU’s recommended room size or area, I have provided justification for this.
  • I confirm that the heating and cooling products quoted will service the majority of my premises and are suitable for the property’s needs.
  • I understand that if the number, type, or condition of existing heating units is different from what I reported, I may become ineligible for VEU rebates.

 

Hot Water System Upgrade – Terms and Conditions

  1. Quotation and Pricing
  • The quoted price is based on current rebate regulations and the information you have provided. Pricing is subject to change should government regulations be amended or if actual site conditions differ from those stated during the quotation process.
  • Additional charges may apply for non-standard installations. This may include, but is not limited to: changes of mind, extended piping requirements, electrical upgrades, drainage modifications, trenching, or additional labour.
  • If you request a change to the installation location on the day of service, additional costs will be incurred.
  1. Site Conditions and Compliance
  • All installations involving plumbing and/or electrical work require compliance with current Australian Standards. If non-compliance is identified, rectification work may be necessary at an additional cost.
  • Astra Green Solutions is not liable for delays, cancellations, or rescheduling caused by site-specific factors such as restricted access, safety hazards, or unforeseen compliance issues.
  1. Standard Installation Inclusions

Standard installation includes the following:

  • Safe removal and decommissioning of the existing hot water system.
  • Supply and installation of the new system at the existing location (unless otherwise specified).
  • Basic plumbing connections (up to 3 metres of piping).
  • Electrical connections to a compliant switchboard (if required).
  • Weatherproofing and commissioning of the new unit.

Please note: Additional charges may apply for relocations, trenching, switchboard upgrades, or non-standard drainage requirements.

  1. Decommissioning of Existing Hot Water System
  • Decommissioning and disconnection of your current hot water system will be carried out by licensed professionals.
  • Where applicable, gas or electrical disconnections will be completed in line with safety regulations.
  • If a gas leak or electrical safety issue is identified, your supply may need to be shut off in accordance with the requirements of the Building Authority (BA), Energy Safe Victoria (ESV), or other governing bodies.
  • Astra Green Solutions can quote to rectify the issue on-site. Alternatively, you may choose to engage your own licensed tradesperson.
  • If the installation is cancelled after decommissioning has taken place, Astra Green Solutions will not reinstate the original system. A $300 + GST service fee will apply.
  1. Surface and Aesthetic Disclaimer
  • Astra Green Solutions is not responsible for any differences in paint colour, surface damage, or the need for patching in areas where the old hot water system has been removed.
  1. Product Warranties
  • Warranties for the new hot water system include:
    • 7 years on the tank
    • 5 years on the compressor
    • 2 years on labour
      Note: This excludes parts or components not supplied by the manufacturer or any external installation materials.
  1. Noise Acknowledgement
  • Heat pump hot water systems may emit operational noise during heating cycles. Customers are advised to refer to the manufacturer’s specifications regarding noise levels.
  1. Promotional Incentives
  • Where gift cards or promotional incentives are offered, full payment must be received before items are released for shipment or collection.
  1. Payment Terms
  • Full payment is due immediately upon completion of installation.
    Failure to make timely payment may result in:
    • Disconnection or disabling of the installed unit
      Astra Green Solutions reserves the right to disconnect or disable the system until payment is received in full.
    • Interest charges
    • Legal action
  1. Stock Responsibility and Ownership
  • Where Astra Green Solutions (AGS) delivers stock to your property prior to installation, you accept full responsibility for the safekeeping of the goods from the time of delivery until installation is complete. AGS will not be liable for any loss, theft, or damage to the stock once it has been delivered.
  • In the event that an installation cannot proceed, you must provide AGS with access to retrieve the stock. You agree not to withhold or retain any goods belonging to AGS.

 

Acknowledgements

By signing this agreement, I acknowledge and agree to the following:

  • Astra Green Solutions is an Accredited Person under the Victorian Energy Upgrades (VEU) Program, and I assign the right to generate VEECs (Victorian Energy Efficiency Certificates) for this installation.
  • My existing hot water system will be decommissioned as part of the upgrade process. Removal of concealed components (such as in-wall pipes or underground infrastructure) is not included unless specified.
  • I confirm that my existing system was not installed or modified for the sole purpose of claiming VEU rebates.
  • I have received, read, and understood the following documents:
    1. VEU Code of Conduct – Statement of Rights
    2. VEU Hot Water System Consumer Fact Sheet
    3. Victorian Energy Efficiency Target Scheme Consumer Fact Sheet
  • I understand that the placement, size, and capacity of the new system may affect its performance and energy efficiency. I confirm the proposed system meets the needs of my property.
  • I understand that if the number, type, or condition of the existing system differs from what I have declared, I may become ineligible for rebates under the VEU program.